# How to convert base 10 decimal to twips

**URL:** <https://forum.kirupa.com/t/how-to-convert-base-10-decimal-to-twips/284331>\
**Category:** Uncategorized\
**Created:** [March 18, 2009, 3:53am UTC](https://forum.kirupa.com/t/how-to-convert-base-10-decimal-to-twips/284331 "2009-03-18T03:53:00Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![GarFonz](https://avatars.discourse-cdn.com/v4/letter/g/f04885/32.png) [@GarFonz](https://forum.kirupa.com/u/GarFonz)\
**Post date:** [March 18, 2009, 3:53am UTC](https://forum.kirupa.com/t/how-to-convert-base-10-decimal-to-twips/284331/1 "2009-03-18T03:53:00Z")

</div>

any ideas?

Basically, I am experiencing an inconsistancy with the behavior of an equation that is calculating the change in y position from one movie clip sequentially from frame to frame, and transforming the amount of change from a smaller range to an amount of change to a larger range; moving the target mc between two points. The inconsistancy is that target mc doesn’t always reach the top and bottom .y points, even though the slider mc does.
